The project is to transport dense-phase CO2 through a 16” pipeline from QG (South) via Station A6 to Jaleha to increase oil production by injecting them into wells in the Dukhan field.
Systems:
– CCTV
– Access Control
– Structured Cabling System
– Telecom System
– PAGA System