EPIC for CO2 WAG Injection Pilot Project at Dukhan Field

The project is to transport dense-phase CO2 through a 16” pipeline from QG (South) via Station A6 to Jaleha to increase oil production by injecting them into wells in the Dukhan field. Systems: – CCTV – Access Control – Structured Cabling System – Telecom System – PAGA System